Ore Reserves and Mineral Resources are reported in accordance with the minimum standards described by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2004 Edition), and also conform to the standards set out in the South African Code for the Reporting of Mineral Resources and Mineral Reserves (SAMREC 2000 Code). Mineral Resources are inclusive of the Ore Reserve component unless otherwise stated.
The 2008 Mineral Resource increased by 40.5 million ounces before the subtraction of depletion. After a depletion of 7.2 million ounces, the net increase is 33.4 million ounces to give a total Mineral Resource of 241.0 million ounces. Mineral Resources were estimated at a gold price of $1,000/oz (2007: $700/oz). The increased gold price resulted in 13.3 million ounces being added to the Mineral Resource while successful exploration and revised modelling resulted in a further increase of 27.5 million ounces. The remaining loss of 0.3 million ounces is the result of various other reasons.
| Mineral Resource | Million oz | |
|---|---|---|
| Mineral Resources as at 31 December 2007 | 207.6 | |
| Reductions | ||
| TauTona | Transfers to Mponeng | (1.9) |
| Great Noligwa | Transfer of SV4 to Moab Khotsong | (1.2) |
| Tau Lekoa | Significant structure and facies changes to the north of Tau Lekoa | (1.2) |
| Other | Total of non-significant changes | (1.4) |
| Additions | ||
| La Colosa | Successful greenfields exploration | 12.3 |
| Mponeng | Granting of WUDLs licence and transfers from TauTona | 7.9 |
| Moab Khotsong | Transfer of SV4 to Moab Khotsong | 4.4 |
| Obuasi | Exploration below 50 Level | 3.9 |
| Savuka | Improved economic outlook as a result of an increase in the gold price | 1.8 |
| Boddington | Growth in Mineral Resources: successful near-mine exploration drilling and higher gold price | 1.6 |
| Iduapriem | Due to increase in Mineral Resource gold price and remodelling of Block 7 & 8 | 1.4 |
| Cripple Creek & Victor | Successful exploration | 1.2 |
| Sadiola | Due to increase in Mineral Resource gold price, increase in the deep sulphides project | 1.2 |
| Siguiri | Due to increase in Mineral Resource gold price and increases in the Mineral Resource at Sintroko and Foulata | 1.0 |
| Other | Total of non-significant changes | 2.4 |
| Mineral Resources as at 31 December 2008 | 241.0 | |
The 2008 Ore Reserve increased by 7.7 million ounces before the subtraction of depletion. After a depletion of 5.9 million ounces, the net increase is 1.8 million ounces to give a total Ore Reserve of 74.9 million ounces.
A gold price of $720/oz was used for Ore Reserve estimates (2007: $600/oz). The change in economic assumptions made from 2007 to 2008 resulted in the Ore Reserve increasing by 2.7 million ounces while exploration and modelling resulted in an additional increase of 5.0 million ounces.
| Ore Reserve | Million oz | |
|---|---|---|
| Ore Reserves as at 31 December 2007 | 73.1 | |
| Reductions | ||
| TauTona | Carbon Leader ground between 123-126 levels was transferred to Mponeng. With the change to scattered grid mining, lower value estimates resulting from increased sampling and drilling resulted in reductions. These were partially offset by a higher mine call factor and the inclusion the Carbon Leader eastern block. | (1.5) |
| Geita | Mineral Resource model changes and the application of grade factors to mitigate low model confidence; cost increases | (1.4) |
| Great Noligwa | Transfer of the SV4 section to Moab Khotsong. | (1.3) |
| Other | Total of non-significant changes | (1.1) |
| Additions | ||
| Mponeng | Increased grades, the additional ground from TauTona 123-126 level and improved economics which allowed for the mining of Block 3 & 5. | 2.8 |
| Obuasi | The increase is due to a revised mine design and schedule. | 1.3 |
| Boddington | The growth in Ore Reserve is due to successful drilling and a higher gold price | 1.1 |
| Siguiri | The Seguelen NW and Sintroko deposits were upgraded from Inferred to Indicated Mineral Resource and the mining efficiency increased. | 0.6 |
| Other | Total of non-significant changes | 1.3 |
| Ore Reserves as at 31 December 2008 | 74.9 | |
Several by-products are recovered as a result of the processing of gold Ore Reserves.
These include 0.19 million tonnes of uranium from the South African operations, 0.29 million tonnes of copper from Australia, 0.44 million tonnes of sulphur from Brazil and 35.7 million ounces of silver from Argentina. Details of by-product Mineral Resources and Ore Reserves are given in the Mineral Resource and Ore Reserve Report 2008, which is available either on the corporate website or on request from the contacts.
During the course of the year and as part of the rolling audit programme, AngloGold Ashantis 2008 Mineral Resources and Ore Reserves for the following operations were submitted for external audit:
The company has been informed that the audit identified no material shortcomings in the process by which AngloGold Ashanti's Ore Reserves and Mineral Resources were evaluated. It is the company's intention to continue this process so that each of its operations will be audited every three years on average.
The information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves is based on information compiled by the Competent Persons. These individuals are identified in the report. The Competent Persons consent to the inclusion of Exploration Results, Mineral Resources and Ore Reserves information in this report, in the form and context in which it appears.
During the past decade, the company has developed and implemented a rigorous system of internal and external reviews of Exploration Results, Mineral Resources or Ore Reserves. A documented chain of responsibility exists from the Competent Persons at the operations to the company's Mineral Resource and Ore Reserve Steering Committee. Accordingly, the Chairman of the Mineral Resource and Ore Reserve Steering Committee, VA Chamberlain, MSc (Mining Engineering), BSc (Hons) (Geology), MAusIMM, assumes responsibility for the Mineral Resource and Ore Reserve processes for AngloGold Ashanti and is satisfied that the Competent Persons have fulfilled their responsibilities.
Note
A detailed breakdown of Mineral Resources and Ore Reserves is provided in the report entitled,
"Mineral Resources and Ore Reserve Report 2008" (PDF - **KB), it may be downloaded as a PDF file using Adobe Acrobat Reader. This information is also available on request from the
AngloGold Ashanti offices.
| as at 31 December 2008 | Resource category | Tonnes million | Grade (g/t) | Contained gold tonnes | Contained gold million oz |
|---|---|---|---|---|---|
| South Africa | Measured | 25.56 | 13.80 | 352.57 | 11.34 |
| Indicated | 739.87 | 3.27 | 2,416.79 | 77.70 | |
| Inferred | 56.35 | 10.47 | 590.06 | 18.97 | |
| Total | 821.77 | 4.09 | 3,359.42 | 108.01 | |
| Argentina | Measured | 11.01 | 1.73 | 19.04 | 0.61 |
| Indicated | 22.00 | 3.48 | 76.49 | 2.46 | |
| Inferred | 4.97 | 4.11 | 20.45 | 0.66 | |
| Total | 37.99 | 3.05 | 115.98 | 3.73 | |
| Australia | Measured | 101.25 | 1.19 | 120.77 | 3.88 |
| Indicated | 404.49 | 0.84 | 340.15 | 10.94 | |
| Inferred | 154.79 | 0.89 | 138.43 | 4.45 | |
| Total | 660.53 | 0.91 | 599.35 | 19.27 | |
| Brazil | Measured | 11.11 | 7.01 | 77.80 | 2.50 |
| Indicated | 13.46 | 6.49 | 87.36 | 2.81 | |
| Inferred | 28.51 | 6.76 | 192.59 | 6.19 | |
| Total | 53.07 | 6.74 | 357.75 | 11.50 | |
| Colombia | Measured | | | | |
| Indicated | | | | | |
| Inferred | 409.77 | 1.01 | 415.45 | 13.36 | |
| Total | 409.77 | 1.01 | 415.45 | 13.36 | |
| Democratic Republic of Congo | Measured | | | | |
| Indicated | | | | | |
| Inferred | 29.25 | 2.69 | 78.53 | 2.52 | |
| Total | 29.25 | 2.69 | 78.53 | 2.52 | |
| Ghana | Measured | 94.21 | 5.21 | 490.68 | 15.78 |
| Indicated | 138.91 | 2.86 | 397.31 | 12.77 | |
| Inferred | 100.10 | 4.25 | 425.27 | 13.67 | |
| Total | 333.23 | 3.94 | 1,131.26 | 42.22 | |
| Guinea | Measured | 33.53 | 0.63 | 21.25 | 0.68 |
| Indicated | 125.22 | 0.84 | 105.53 | 3.39 | |
| Inferred | 64.08 | 0.90 | 57.85 | 1.86 | |
| Total | 222.82 | 0.83 | 184.63 | 5.94 | |
| Mali | Measured | 19.40 | 1.64 | 31.86 | 1.02 |
| Indicated | 26.39 | 2.48 | 65.32 | 2.10 | |
| Inferred | 11.10 | 2.30 | 25.49 | 0.82 | |
| Total | 56.89 | 2.16 | 122.68 | 3.94 | |
| Namibia | Measured | 13.83 | 0.74 | 10.25 | 0.33 |
| Indicated | 61.94 | 1.26 | 78.05 | 2.51 | |
| Inferred | 42.31 | 1.09 | 46.25 | 1.49 | |
| Total | 118.08 | 1.14 | 134.55 | 4.33 | |
| Tanzania | Measured | | | | |
| Indicated | 83.84 | 3.63 | 304.10 | 9.78 | |
| Inferred | 25.12 | 3.81 | 95.77 | 3.08 | |
| Total | 108.97 | 3.67 | 399.87 | 12.86 | |
| United States | Measured | 255.90 | 0.87 | 223.31 | 7.18 |
| Indicated | 183.75 | 0.73 | 134.97 | 4.34 | |
| Inferred | 83.61 | 0.66 | 55.60 | 1.79 | |
| Total | 523.26 | 0.79 | 413.88 | 13.31 | |
| Total | Measured | 565.80 | 2.38 | 1,347.53 | 43.32 |
| Indicated | 1,799.87 | 2.23 | 4,006.08 | 128.80 | |
| Inferred | 1,009.96 | 2.12 | 2,141.75 | 68.86 | |
| Total | 3,375.63 | 2.22 | 7,495.36 | 240.98 |
| as at 31 December 2008 | Category | Tonnes million | Grade (g/t) | Contained gold tonnes | Contained gold million oz |
|---|---|---|---|---|---|
| South Africa | Proved | 13.72 | 7.81 | 107.13 | 3.44 |
| Probable | 215.10 | 4.37 | 939.79 | 30.21 | |
| Total | 228.82 | 4.58 | 1,046.92 | 33.66 | |
| Argentina | Proved | 9.99 | 1.39 | 13.90 | 0.45 |
| Probable | 12.29 | 3.52 | 43.24 | 1.39 | |
| Total | 22.27 | 2.56 | 57.13 | 1.84 | |
| Australia | Proved | 67.82 | 1.10 | 74.54 | 2.40 |
| Probable | 214.50 | 0.90 | 192.57 | 6.19 | |
| Total | 282.33 | 0.95 | 267.11 | 8.59 | |
| Brazil | Proved | 7.77 | 6.44 | 50.06 | 1.61 |
| Probable | 7.02 | 5.82 | 40.87 | 1.31 | |
| Total | 14.79 | 6.15 | 90.93 | 2.92 | |
| Ghana | Proved | 56.85 | 4.24 | 240.89 | 7.74 |
| Probable | 36.43 | 3.82 | 139.10 | 4.47 | |
| Total | 93.28 | 4.07 | 379.98 | 12.22 | |
| Guinea | Proved | 56.13 | 0.56 | 31.48 | 1.01 |
| Probable | 67.11 | 1.04 | 69.64 | 2.24 | |
| Total | 123.24 | 0.82 | 101.12 | 3.25 | |
| Mali | Proved | 9.29 | 1.87 | 17.33 | 0.56 |
| Probable | 6.65 | 2.26 | 15.02 | 0.48 | |
| Total | 15.94 | 2.03 | 32.35 | 1.04 | |
| Namibia | Proved | 7.21 | 0.89 | 6.39 | 0.21 |
| Probable | 27.58 | 1.28 | 35.19 | 1.13 | |
| Total | 34.78 | 1.20 | 41.58 | 1.34 | |
| Tanzania | Proved | | | | |
| Probable | 54.30 | 2.93 | 159.06 | 5.11 | |
| Total | 54.30 | 2.93 | 159.06 | 5.11 | |
| United States | Proved | 122.57 | 0.93 | 104.60 | 3.36 |
| Probable | 55.70 | 0.87 | 48.59 | 1.56 | |
| Total | 168.27 | 0.91 | 153.19 | 4.93 | |
| Total | Proved | 341.35 | 1.89 | 646.31 | 20.78 |
| Probable | 696.67 | 2.42 | 1,683.07 | 54.11 | |
| Total | 1,038.02 | 2.24 | 2,329.38 | 74.89 |
| as at 31 December 2008 | Resource category | Tonnes million | Grade (g/t) | Contained gold tonnes | Contained gold million oz |
|---|---|---|---|---|---|
| South Africa | Measured | 14.62 | 14.08 | 205.80 | 6.62 |
| Indicated | 556.66 | 2.70 | 1,504.17 | 48.36 | |
| Inferred | 56.35 | 10.47 | 590.06 | 18.97 | |
| Total | 627.63 | 3.66 | 2,300.04 | 73.95 | |
| Argentina | Measured | | | | |
| Indicated | | | | | |
| Inferred | | | | | |
| Total | | | | | |
| Australia | Measured | 34.85 | 1.38 | 48.22 | 1.55 |
| Indicated | 189.99 | 0.78 | 147.58 | 4.74 | |
| Inferred | 154.79 | 0.89 | 138.43 | 4.45 | |
| Total | 379.63 | 0.88 | 334.22 | 10.75 | |
| Brazil | Measured | 3.20 | 6.63 | 21.20 | 0.68 |
| Indicated | 6.63 | 6.29 | 41.74 | 1.34 | |
| Inferred | 27.49 | 6.81 | 187.13 | 6.02 | |
| Total | 37.32 | 6.70 | 250.06 | 8.04 | |
| Colombia | Measured | | | | |
| Indicated | | | | | |
| Inferred | 409.77 | 1.01 | 415.45 | 13.36 | |
| Total | 409.77 | 1.01 | 415.45 | 13.36 | |
| Democratic Republic of Congo | Measured | | | | |
| Indicated | | | | | |
| Inferred | 29.25 | 2.69 | 78.53 | 2.52 | |
| Total | 29.25 | 2.69 | 78.53 | 2.52 | |
| Ghana | Measured | 33.32 | 6.42 | 241.08 | 6.88 |
| Indicated | 73.90 | 2.48 | 183.06 | 5.89 | |
| Inferred | 56.46 | 3.75 | 211.95 | 6.81 | |
| Total | 163.69 | 3.72 | 609.09 | 19.58 | |
| Guinea | Measured | 5.57 | 0.70 | 3.91 | 0.13 |
| Indicated | 37.13 | 0.79 | 29.51 | 0.95 | |
| Inferred | 64.36 | 0.91 | 58.49 | 1.88 | |
| Total | 107.06 | 0.86 | 91.91 | 2.95 | |
| Mali | Measured | 4.34 | 0.81 | 3.50 | 0.11 |
| Indicated | 21.42 | 2.37 | 50.75 | 1.63 | |
| Inferred | 11.10 | 2.30 | 25.49 | 0.82 | |
| Total | 36.87 | 2.16 | 79.74 | 2.56 | |
| Namibia | Measured | 6.63 | 0.56 | 3.71 | 0.12 |
| Indicated | 34.36 | 1.18 | 40.61 | 1.31 | |
| Inferred | 42.31 | 1.09 | 46.25 | 1.49 | |
| Total | 83.30 | 1.09 | 90.58 | 2.91 | |
| Tanzania | Measured | | | | |
| Indicated | 35.95 | 3.32 | 119.38 | 3.84 | |
| Inferred | 25.12 | 3.81 | 95.77 | 3.08 | |
| Total | 61.07 | 3.52 | 215.15 | 6.92 | |
| United States | Measured | 143.33 | 0.83 | 118.71 | 3.82 |
| Indicated | 128.04 | 0.67 | 86.38 | 2.78 | |
| Inferred | 83.61 | 0.66 | 55.60 | 1.79 | |
| Total | 354.99 | 0.73 | 260.69 | 8.38 | |
| Total | Measured | 245.87 | 2.52 | 619.12 | 19.91 |
| Indicated | 1,084.10 | 2.03 | 2,203.18 | 70.83 | |
| Inferred | 960.61 | 1.98 | 1,903.16 | 61.19 | |
| Total | 2,290.58 | 2.06 | 4,725.46 | 151.93 |
Siguiri, Guinea
Next > Research and developmentMineral Resources and Ore Reserves
ANGLOGOLD ASHANTI Annual Financial Statements 2008