Summarised group operating results

20042003200220012000

Operating results

 
Underground operations
Metric tonnes milled00013,55413,04713,42617,954 21,293
Yieldg/t7.508.038.278.20 7.96
Producedoz 0003,2703,3673,5694,7345,451
Productivity 
g/employeetarget270236247219 209
 actual254228238214 193
Surface and dump reclamation
Metric tonnes treated00035,80036,82238,36650,355 50,289
Yieldg/t0.310.270.300.320.32
Producedoz 000360320365514 510
Open-pit operations
Metric tonnes mined000135,171125,52997,03051,66722,867
Stripping ratio(1)6.348.956.186.935.22
Metric tonnes treated00018,23613,96713,68215,29413,332
Yieldg/t3.213.433.802.992.41
Producedoz 0001,8841,5401,6731,4691,034
Heap-leach operations
Metric tonnes mined00071,83759,50751,19234,12326,253
Metric tonnes placed(2)00022,12018,26513,50411,74810,269
Stripping ratio(1)2.082.592.631.731.59
Gold placed(3)kg18,53414,78214,22810,6688,002
Yield(4)g/t0.840.811.050.910.78
Producedoz 000538389332266248
Total gold producedoz 0006,0525,6165,9396,983 7,243
- South Africaoz 0003,0793,2813,4124,6705,418
- Argentinaoz 000211209179136132
- Australiaoz 000410432502508524
- Braziloz 000334323299305307
- Ghanaoz 000485----
- Guineaoz 00083----
- Malioz 000475577710508289
- Namibiaoz 0006773858777
- Tanzaniaoz 000570331290273-
- USAoz 000329390462496496
- Zimbabweoz 0009----
Price received$/oz sold394363303287308
Total cash costs(5)$/oz produced268214150166200
Total production costs(5)$/oz produced336263192202 231
Capital expenditure(5)$m585449337382 404
Monthly average number of employees65,40055,43954,04270,380 84,036
LTIFR6.548.838.8610.55 11.58
FIFR0.190.290.310.25 0.23
Rand/dollar average exchange rate6.447.5510.488.626.78
Rand/dollar closing exchange rate5.656.678.5811.967.58
Australian dollar/dollar average exchange rate1.361.541.841.931.70
Australian dollar/dollar closing exchange rate1.281.331.791.961.80
(1) Stripping ratio = (total tonnes mined - ore tonnes mined)/ore tonnes mined.
(2) Tonnes placed onto leach pad.
(3) Gold placed into leach pad inventory.
(4) Gold placed/tonnes placed.
(5) Restated to reflect the change in accounting treatment of ore reserve development expenditure.

Annual Report 2004